Construction Projects

With the oversight of the Office of State Engineers and Senior Executives of the College, for capital and/or construction related projects, the College's Operation Office is responsible for coordinating and planning all projects from conception to completion.


LIST OF CURRENT CONSTRUCTIONS RELATED PROJECTS:

Project Number #: H59-N024-JM MTC Industrial Technology Building Transformer Replacement - Airport Campus

Bid/Submittal Due Date:
March 5, 2020 - 2:00pm
Location: Airport Campus in Saluda Hall, Room 170

Project Coordinator:
Carey Page
Telephone: 803-822-3217
Email: pagewc@midlandstech.edu

Pre-Bid Meeting:
February 18, 2020 at 10:00 am
Midlands Technical College, Airport Campus
Saluda Hall, Room 170

Project Description: Remove existing pole mounted transformers and overhead power line feeding Industrial Building. Provide pad mounted transformer and medium voltage feeder from existing pad mounted switch.

Project Details:
Documents may be obtained from: A+E Digital Printing, 517 King Street, Charleston, SC 29403.
Phone: 843-853-5066
Website: http://aeplanroom.com

Addenda will only be able to be obtained by those buying full sets.

Attachments:


Project Number #: H59-6127-CB MTC Industrial Technology Building Expansion and Welding Lab Upgrade - Airport Campus

Bid/Submittal Due Date:
November 26, 2019 - 2:00pm
Location: Airport Campus in Reed Hall, Room 119

Project Coordinator:
Carey Page
Telephone: 803-822-3217
Email: pagewc@midlandstech.edu

Pre-Bid Meeting:
November 12, 2019 at 2:00 pm
Midlands Technical College, Airport Campus
Industrial Building

Project Description: This project is an instructional welding facility and includes gutting an existing building, renovation and a new addition. Exterior materials include metal panels, storefront, glazing, overhead doors and exterior covered canopy. Mechanical systems include dust collection system with collector arms. Complete Fire Protection, Electrical, Plumbing, and Fire Alarm systems included.

Project Detailshttp://tiny.cc/mtcindustrial

Attachments:


Project # MTC 19-11 Saluda Hall Restroom Renovation - Airport Campus 

Bid/Submittal Due Date:
October 24, 2019 - 2:00pm
Location: Airport Campus in Reed Hall, Room 119

Project Coordinator:
Carey Page
Telephone: 803.822-3217
Email: pagewc@midlandstech.edu

Pre-Bid Meeting:
October 15, 2019 at 10:00 am
Midlands Technical College, Airport Campus
Saluda Hall, Room 170

Project Description: This project consists of an interior restroom renovation of two multi-user restrooms within an existing single-story building. This project scope relates to the owners concern of aesthetic, maintenance and accessibility requirements. The renovation consists of standard partitions, plumbing, HVAC and lighting modifications. New accessible lavatories, phenolic toilet compartments and urinal screens have been designed to meet accessible/ANSI requirements.

Project Detailshttps://scbo.sc.gov/files/scbo/H59-N033-CB.pdf

Attachment:

NOTICE OF INTENT TO AWARD - NO AWARD - UPDATED 10/28/19   


Project # H59-6140-CB MTC: Center for QuickJobs Training and Workforce Development​ - Request for Qualifications (RFQu) - Constructions Management-at-Risk - RE-ADVERTISEMENT

Submittal and Project Schedule

  • (1) Request for Qualifications Due....................................................................................October 18, 2019
  • (2) Meeting to discuss RFQ’s (Saluda Hall Room 170) - Executive Session....................October 24, 2019 at 11:00 am in Saluda Hall Room 170
  • (3) Short-list of firms announced........................................................................................October 25, 2019
  • (4) Technical Proposals (RFP) from short-listed firms due...............................................November 21, 2019
  • (5) Interviews, Cost Proposals and final ranking of short-listed firms...............................December 2-3, 2019
  • (6) Negotiations conclude....................................................................................................No later than January 06, 2020

Project Coordinator: Teresa Cook // Telephone: 803.822-3216 // Email: cookta@midlandstech.edu

FOR FURTHER DETAILS, SEE PROJECT H59-6140-CB BELOW. 

Attachment: 

THERE WERE NO ADDENDUMS FOR THIS PROJECT. 

CM-R RFP Final: /sites/default/files/mtc/Procurement/mtc_cm-r_rfp-final_10-24-19.pdf


Project #: MTC 19-04 Wade Martin Drainage – Beltline Campus

Bid/Submittal Due Date:
August 13, 2019 - 2:00pm
Location: Airport Campus in Reed Hall, Room 119

Project Coordinator:
Carey Page
Telephone: 803-822-3217
Email: pagewc@midlandstech.edu

No Pre-Bid Meeting:
If you would like to see the site, contact Tanis Manseau
Telephone: 803.738-7741
Email: pagewc@midlandstech.edu

Project Description: Remove and replace existing asphalt parking and concrete sidewalk, curb and gutter as necessary to install a new Type 16 Catch Basin, and associated 15” RCP. Work will also include video inspection of existing roof drain line in this area.

Attachments:      


Project #: H59-N017-PD Central Advising Construction – Airport Campus

Bid/Submittal Due Date:
August 29, 2019 - 2:00 pm
Location: Airport Campus in Saluda Hall, Room 170

Project Coordinator:
Carey Page
Telephone: 803-822-3217
Email: pagewc@midlandstech.edu

Project Description: Renovation of existing 3,400 sf facilities for MTC Central Advising Offices - Second Floor Airport Student Center. To include Architecture, Interiors. Mechanical, Electrical, and Fire Protection. New spaces to include offices, waiting rooms, break rooms without plumbing, computer areas, and storage.

Project Detailshttps://scbo.sc.gov/files/scbo/H59-N017-PD.pdf

Attachments: 


Project #: H59-N016-CA - Wade Martin Central Advising Construction - Beltline Campus

Bid/Submittal Due Date:
August 15, 2019 - 2:00 pm
Location: Airport Campus in Reed Hall, Room 119

Project Coordinator:
Carey Page
Telephone: 803.822-3217
Email: pagewc@midlandstech.edu

Project Description: The work includes approximately 5,200 sf of interior renovation on the first floor in Midlands Technical College's existing Wade Martin Building. Scope includes demolition and reconfiguration of interior partitions; associated mechanical, plumbing, fire protection and electrical scope; and interior finishes.

Project Detailshttps://scbo.sc.gov/files/scbo/H59-N016-CA.pdf

Attachment


Project # H59-6140-CB MTC: Center for QuickJobs Training and Workforce Development​ - Request for Qualifications (RFQu) - Constructions Management-at-Risk 

 ***CANCELLATION PRIOR TO OPENING***

Submittal and Project Schedule

  • (1) Request for Qualifications Due....................................................................................June 3, 2019
    • Meeting to discuss RFQ’s (Saluda Hall Room 170) - Executive Session -   Time: 3:00 pm  
  • (2) Short-list of firms announced........................................................................................June 10, 2019
  • (3) Pre-proposal conference and site tour (mandatory)....................................................July 08, 2019, 2:00 pm
  • (4) Technical Proposals (RFP) from short-listed firms due...............................................July 31, 2019
  • (5) Interviews, Cost Proposals and final ranking of short-listed firms...............................August 14, 2019
  • (6) Negotiations conclude.............................................................................No later than August 30, 2019

Project Coordinator: Teresa Cook // Telephone: 803-822-3216 // Email: cookta@midlandstech.edu

FOR FURTHER DETAILS, SEE PROJECT H59-6140-CA BELOW. 

Attachments:


Project #: MTC 19-04 MTC-Wade Martin Drainage

Bid/Submittal Due Date:
May 22, 2019 - 2:00pm
Location: Airport Campus in Reed Hall, Room 119

Project Coordinator:
Carey Page
Telephone: 803-822-3217
Email: pagewc@midlandstech.edu

No Pre-Bid Meeting: If you would like to see the site, contact Carey Page, telephone: 803-822-3217. Email: pagewc@midlandstech.edu

Project Description: Remove and replace existing asphalt parking and concrete sidewalk, curb and gutter as necessary to install a new Type 16 Catch Basin, and associated 15” RCP. Work will also include video inspection of existing roof drain line in this area.

Attachments:


PROJECT #: H59-D943-FW IDC: MTC-Mechanical Construction Services

Pre-Bid Conference:
April 24, 2019 at 10:00 a.m.
Location: NE Campus, CET Building - Room 109

Bid/Submittal Due Date:
May 7, 2019 at 2:00 p.m.
Location: Airport Campus in Reed Hall, Room 119

Project Coordinator: Carey Page // Telephone: 803.822-3217 // Email: pagewc@midlandstech.edu

Project Description: Replace existing Liebert unit and condensing unit serving the data center. Add back-up wall mounted mini split system in the data center. Construction Services to include HVAC and Plumbing License Category -AC5, -HT5, -PB5, -BL3.

Project Details: https://scbo.sc.gov/files/scbo/H59-D943-FW.pdf

Attachments:


PROJECT # H59-6127-CA  MTC: Industrial Technology Building Expansion and Welding Lab Upgrade

Pre-Bid:
March 14, 2019 at 2:00 PM
Location: Airport Campus, Industrial Building (Non-Mandatory)

Bid Due Date & Time:
April 4, 2019 @ 2:00 p.m.
Location: Airport Campus in Reed Hall, Room 119

Project Coordinator: Carey Page // Telephone: 803.822-3217 // Email: pagewc@midlandstech.edu

Architect: Watson Tate Savory; Gene Bell // Telephone: 803.851-0924

Email: gbell@watsontatesavory.com

Project Description: This project is an instructional welding facility and includes gutting an existing building, renovation and a new addition. Exterior materials include metal panels, storefront, glazing, overhead doors and exterior covered canopy. Mechanical systems include dust collection system with collector arms.  Complete Fire Protection, Electrical, Plumbing, and Fire Alarm systems included. Electronic copies of the plans and specifications may be downloaded from; https://goo.gl/d1mdNb.  Addenda will be posted to this same location.

Attachments:


PROJECT # H59-6140-CA  MTC: Center for QuickJobs Training and Workforce Development

Pre-Submittal:
March 18, 2019 at 3:00 PM
Location: Beltline Campus, LET Building Room 110 (Non-Mandatory)

Submittal Closing Date & Time:
4/2/2019 @ 2:00 p.m.
Location: Airport Campus in Reed Hall, Room 119

Project Coordinator: Teresa Cook // Telephone: 803.822-3216 // Email: cookta@midlandstech.edu

Project Description: The project consists of the demolition of two existing builds, LET four-story building (65,000 sq. ft.) and EL building (13,000 sq. ft.), and construction of a new 54,000 sq. ft. classroom building on the site of the EL building and construction of a new parking area on the site of the former LET building. In additional to the required SF-330, submit brief detailed information that will inform the selection committee with the qualifications of the proposed A/E team.

Attachments:


PROJECT # H59-N991-FW - MTC: CET CHILLER REPLACEMENT

Pre-Bid:
April 3, 2018 @ 10:00 AM
Location: NE Campus, CET Building Room 109

Closing Date & Time:
April 12, 2018 @ 2:00 p.m.
Location: Airport Campus in Reed Hall, Room 119

Project Coordinator: Teresa Cook // Telephone: 803-738-7741 // Emailcookta@midlandstech.edu

Project Description: Replace air cooled chiller at the Northeast Campus CET Building

Attachments:


PROJECT # H59-N75-FW - MTC'S WADE MARTIN CHILLER REPLACEMENT

Closing Date & Time:
October 16, 2017 @ 11:00 AM

Project Coordinator: Teresa Cook // Telephone: 803-738-7741 // Email: cookta@midlandstech.edu

Project Description: Replace air cooled chiller and associated pump at the Wade Martin Building.

Buyer's Contact Information:
Rina Drescher
Phone: 803-822-3209
Fax: 803-822-3672

Attachments:

Notice of Intent to Award: